| The coal conveyor is on the left |
| Arch beams are not painted |
| Miners wash down the concrete floor to keep it clean |
| Arches can be installed in lower areas |
| The coal conveyor is on the left |
| Arch beams are not painted |
| Miners wash down the concrete floor to keep it clean |
| Arches can be installed in lower areas |
| Arches were installed at the end of the concrete tunnel in the rock section |
| The angles attached to the vertical beams were used to support cross beams. An elevated floor deck was poured later which split the tunnel into a top and bottom compartment. |
| The access opening at the top of the arch is closed as the backfill goes over the arch |
![]() |
| Gould Tunnel Arches and Concrete Footers |
![]() |
![]() |
| In Process |
![]() |
| Lagging On Inside of Beams or Outside |
| Optional Wall Anchors |

![]() |
| Arches installed prior to covering with dirt for mine decline |
![]() |
| Painted arches and lagging |
![]() |
| Galvanized lagging |
![]() |
| High and wide arches |
![]() |
| In front of a highwall |