Tuesday, July 30, 2013

Train Tunnel In Ohio

These photos are from a train tunnel rehabilitation in Ohio. The arch sets and steel lagging (between the steel beams) are painted. Arches are connected via "struts" which bolt each arch set to the next arch.
Gould Tunnel Arches and Concrete Footers


In Process
Lagging On Inside of Beams or Outside
Optional Wall Anchors

No comments:

Post a Comment